Unexpected traffic delays can be a headache, so here's a heads up on John Deere Road.

The Illinois Department of Transportation reports that an inside lane closure will be installed on eastbound John Deere Road between Interstate 74 and 38th Street according to the QC Times.

The lane closure will be today through Wednesday.

The new overhead sign truss foundations are being installed, with the overhead truss to be installed in spring 2020.

Drivers can expect delays and should allow extra time for trips through this area. To avoid the work area, when feasible, use of alternate routes should be considered.

Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.

More From B100